Engineering capabilities
Physical Design
Move from a verified netlist through floorplanning, place-and-route, timing closure, and sign-off preparation.
Your design challenge
Take your design from netlist to GDS-II.
Move from a verified netlist through floorplanning, place-and-route, timing closure, and sign-off preparation.
Capabilities
- Floorplanning & power planning
- Place-and-route & clock tree synthesis
- Static timing analysis & closure
- DFM & sign-off (DRC/LVS/STA)
Working with your team
A clear path to delivery.
Agree the requirements, responsibilities, and handoff before implementation begins.
-
01
Share your requirements
Outline your application, design stage, constraints, and target schedule.
-
02
Align the scope
Discuss the engineering work, deliverables, and how our teams will collaborate.
-
03
Plan the handoff
Agree milestones, review points, and the documentation your team needs.
Start a conversation
Move your design forward.
Start with your requirements. We’ll discuss where our team can contribute.